Skip to content

Provenance and quality

Documented build quality

The house was completed in 2022. Below is a summary of structure and technical background; detailed extracts are issued with the documentation.

Nabe tee 9 building and plot from above
Year built
2022 - the house is new and has been carefully kept.
Building register
Register data and areas issued as an extract on request.
Structure
A modern frame solution designed for year-round coastal conditions.
Facade
Light timber cladding with floor-to-ceiling windows under a pitched roof.
Roof
Modern roof build-up with rainwater system.
Windows
Large glazed areas with energy-efficient window units.
Insulation
Insulation package to the 2022 requirements.
Ventilation
Mechanical ventilation with heat recovery.
Heating systemTo be verified
Exact solution and data being confirmed before launch.
SolarTo be verified
Presence and capacity being confirmed before launch.
Construction photosAvailable on request
Photos from the build stages available on request.
DrawingsAvailable on request
Architectural drawings available on request.

Data room

For serious buyers we open a structured data room: drawings, register data, energy documentation and operating data. Sensitive documents are never published on the site.

Frequently asked questions

When was the house completed?

The house was completed in 2022.

Is the technical information verified?

The core facts are. Heating and solar details are still being confirmed before launch and are flagged as such on this page.

Price

480 000 €